It’s a mess
because we’re emptying out the cupboards and packing up anything that’s
loose. We’re doing that to get out of the way of the workers who are
going to fix everything up for us. They’re fixing everything up because
the bottom of the cabinets and the floor in front of the sink are saturated,
because there was a water leak, because there was a hole in the PEX flexible
plumbing, because a mouse or rat chewed on it while we were gone, because the
skirting around the base of the house wasn’t perfectly sealed and the varmint
got in. Don’t know why he chewed the plumbing. We’ve had mice
before and none of them ever chewed through the plumbing. I guess that’s
his personal superpower.
While we had the
skirting around the house open to let the water dry out another possum got in,
so Donald the pest control guy came out and set a trap. Here is the
possum playing possum.
…but I digress.
That’s a big
section of floor that has to be repaired and replaced so we’re just doing all
the floor in the whole house and it will all match. We can’t just pull
out one section of cabinet and replace it with a dry one, like the insurance
company is limiting its coverage to, so we’ll upgrade the cabinets while we’re
at it. We needed to anyway. The cabinets are trailer furniture;
pressed wood with a paper layer to look like wood. The paper was
peeling. (We’ve been here fifteen years already.)
No comments:
Post a Comment